Posted by on Feb 27, 2018 in | No Comments

Award winning theatre company, Jordan & Skinner approached BHE to refurb their tired looking (and heavy!!!) scenic elements for their production of ‘At a Stretch’ before a tour.
BHE relieved the existing steel deck of its triple layering of underlay, 18mm marine ply and 18mm MDF sheet that houses the lighting elements and reworked the design into a new single layer of 18mm plywood.
In total around 300kg’s of weight was lost, saving the company fit up labour, logistic costs and a whole load of grumbling when opening the van doors at a venue.
Spend a little, save a lot!